RC meeting and Run Plan, Friday January 14th

From SBS wiki
Jump to: navigation, search

<<SBS Main<<Run Coordinators <<Daily Meetings

RC Meeting Information

Run Coordinator: Bill Henry

Time: 3:15 pm

Remote connection link: https://jlab-org.zoomgov.com/s/1619032184

Or join meeting with the following methods Phone one-tap Phone one-tap: US: +16692545252,,1619032184# or +16468287666,,1619032184# Join by Telephone For higher quality, dial a number based on your current location. Dial: US : +1 669 254 5252 or +1 646 828 7666 or +1 551 285 1373 or +1 669 216 1590 or 833 568 8864 (Toll Free) Meeting ID: 161 903 2184 International numbers Join from an H.323/SIP room system H.323: 161.199.138.10 (US West) 161.199.136.10 (US East) Meeting ID: 161 903 2184 Passcode: 260715 SIP: 1619032184@sip.zoomgov.com Passcode: 260715

Upcoming Shifts Which Need Filled

URGENT: Shifts in January/February need help - 15 openings to fill

Next opening: This Wednesday OWL

Saturday/ Sunday/ Monday Swing: TO has Trade Request

Accelerator and Hall Status

  • Hall A is going to controlled access shortly
  • Survey and alignment completed
  • Target will be pumped down and cooled tonight
  • Target will be condensed Saturday Day
  • Ready for beam Saturday Swingish

Run Plan

  • Will ion chamber calibrations need to be redone? Just the one by the target.


  • Harp Scans


  • Beam Centering
    • Dave Meekins said we might have to change the encoder if there is an offset


  • Move to LD2


  • Current Scan for GEM linearity study Contact John Boyd
    • one minute at 1, 3, 5, 7.5, 10 uA
    • take one coda run
    • screen shot HV


  • Start taking data on LD2 at 5 uA
    • Will need Andrew to look at 50k
    • Can we go higher in current ??
    • Run for 5 hours on LD2


  • Start taking data on LH2 at 15 uA
    • Will need Andrew to look at 50k
    • Can we go higher in current ??
    • Run for 2 hours on LH2


  • Start taking data on Dummy at 20 uA
    • Run for 2 hours on Dummy


  • Production according to the SBS-14 plan

Resolved Issues

  • BB Hodoscope HV instructions update in CH [1]

Unresolved Issues

  • Cryo Target Motion Controller
  • BB Hodo HV not in EPICS/alarm handler. Is this what shifters should do here
  • 20+ shifts to fill

Subsystem Updates

  • Beamline:
  • DAQ general
  • HCal
  • BBCal
  • Timing Hodoscope
  • GRINCH
  • GEMS
  • Replay analysis