RC meeting and Run Plan, Friday January 28st
<<SBS Main<<Run Coordinators <<Daily Meetings
Contents
RC Meeting Information
Run Coordinator: Kondo Gnanvo
Time: 3:15 pm
Remote connection link: https://jlab-org.zoomgov.com/s/1619032184
Or join meeting with the following methods Phone one-tap Phone one-tap: US: +16692545252,,1619032184# or +16468287666,,1619032184# Join by Telephone For higher quality, dial a number based on your current location. Dial: US : +1 669 254 5252 or +1 646 828 7666 or +1 551 285 1373 or +1 669 216 1590 or 833 568 8864 (Toll Free) Meeting ID: 161 903 2184 International numbers Join from an H.323/SIP room system H.323: 161.199.138.10 (US West) 161.199.136.10 (US East) Meeting ID: 161 903 2184 Passcode: 260715 SIP: 1619032184@sip.zoomgov.com Passcode: 260715
Upcoming Shifts Which Need Filled
URGENT: Shifts February need help - only 1 opening remaining
Accelerator and Hall Status
- MCC has been tuning beam a couple of times today
Run Plan
- We are following the run plan (updated) for SBS https://logbooks.jlab.org/entry/3977337
- Thu 1/27 Day & swing shift: Beam was ~50% available for us => continue with LH2 prod.
- Fri 1/28 Owl shift: Beam delivery was good => completed LH2 run (part #4) and start LD2
- Fri 1/28 Day shift: Not so smooth beam => we should complete LD2 run (part #4) and start Part #5 with SBS @ 50%
- Discuss move to SBS-9 configuration => Jessie want to know the plans (if on Monday / Tuesday ...)
- How to deal with the forecast winter storm this week end?
Resolved Issues
Unresolved Issues
- one GEM APV disabled => https://logbooks.jlab.org/entry/3977698
- Need in controlled access in to replace the card when there is an opportunity
- Ongoing issue with ion chamber reading
- Check target centered => looks good overall: https://logbooks.jlab.org/entry/3978330
- check beam size with harp scan ==> looks good too: https://logbooks.jlab.org/entry/3978340