  • Re-established beam last night late swing. Had to change the positions a small amount to center the beam spot [1]
  • 15uA on H during day shift. Modified the GEM HV some to improve the front tracker [2]. Finally moved up 1% more on the gas mix [3]. Settling now with SBS GEM HV off.
  • Evaluate on H target the GEM gain, then proceed to production:
  • 10uA on D data-taking on swing and owl.
  • GEM work yesterday [4]
  • ECal work yesterday [5]
  • Analyzer and hodoscope work [6]

Planned Access to the Hall

Access Tuesday:

  • GEMs work:
    • inspect GEM HV as able
    • APVs on XW L0
  • ECal:

Accelerator

Plan unchanged from yesterday:

  • no Wien angle change next Tuesday for Hall A pass change;
  • Accelerator beam studies currently scheduled on May 19th starting at 7am

Current Run Plan

Take data at 10 uA for production on LD2: BBCal threshold at -350 mV and HCal threshold at -14 mV for now. Once per day (preferably during day shift), take a 3 hours at 15 uA on LH2 with the production settings. See also Experiment run plans.

Current Issues

  • Alignment and pedestals needed for GEMs.
  • GEM DAQ issues

Future plans

Neutron detection efficiency measurement feasibility