RC meeting and Run Plan, Monday February 7th
<<SBS Main<<Run Coordinators <<Daily Meetings
Contents
RC Meeting Information
Run Coordinator: Arun Tadepalli
Time: 3:15 pm
Remote connection link: https://jlab-org.zoomgov.com/j/1619032184?pwd=aWhTVWxya1ZZQzA1K2ZPSTd2ZXZ2QT09#success
Or join meeting with the following methods Phone one-tap Phone one-tap: US: +16692545252,,1619032184# or +16468287666,,1619032184# Join by Telephone For higher quality, dial a number based on your current location. Dial: US : +1 669 254 5252 or +1 646 828 7666 or +1 551 285 1373 or +1 669 216 1590 or 833 568 8864 (Toll Free) Meeting ID: 161 903 2184 International numbers Join from an H.323/SIP room system H.323: 161.199.138.10 (US West) 161.199.136.10 (US East) Meeting ID: 161 903 2184 Passcode: 260715 SIP: 1619032184@sip.zoomgov.com Passcode: 260715
RC Report
- We continue to take good quality production data in cycles of LD2 and LH2. We've had some intermittent slow drifting of SBS magnet current which resets itself (https://logbooks.jlab.org/entry/3983246) and DAQ crashes which were addressed during the owl shift by Alex. Other than that, the plan is to perform GEM R&D runs (with GRINCH OFF) from 6:00 - 7:00 PM and continue with production running until beam is taken away from us at 7:00 AM tomorrow morning!
Upcoming Shifts Which Need To Be Filled
Accelerator and Hall Status
- Beam will be turned off at 7:00 AM on Tuesday.
Run Plan
- SBS-9: cycles of LD2 and LH2 (50M & 10M changed to 100M and 20M and 2 hrs to save time between target changes and DAQ start stops) and an occasional dummy run every two days.
- Request from spokespersons for an extension due to beam time loss - not approved.
To do
- GEM R&D runs - Monday Swing 6:00 - 7:00 PM (Nilanga, Anu, Kondo & notify the rest of the GEM group on slack)