RC meeting and Run Plan, Monday February 7th

From SBS wiki
Jump to: navigation, search

<<SBS Main<<Run Coordinators <<Daily Meetings

RC Meeting Information

Run Coordinator: Arun Tadepalli

Time: 3:15 pm

Remote connection link: https://jlab-org.zoomgov.com/j/1619032184?pwd=aWhTVWxya1ZZQzA1K2ZPSTd2ZXZ2QT09#success

Or join meeting with the following methods Phone one-tap Phone one-tap: US: +16692545252,,1619032184# or +16468287666,,1619032184# Join by Telephone For higher quality, dial a number based on your current location. Dial: US : +1 669 254 5252 or +1 646 828 7666 or +1 551 285 1373 or +1 669 216 1590 or 833 568 8864 (Toll Free) Meeting ID: 161 903 2184 International numbers Join from an H.323/SIP room system H.323: 161.199.138.10 (US West) 161.199.136.10 (US East) Meeting ID: 161 903 2184 Passcode: 260715 SIP: 1619032184@sip.zoomgov.com Passcode: 260715

RC Report

  • We continue to take good quality production data in cycles of LD2 and LH2. We've had some intermittent slow drifting of SBS magnet current which resets itself (https://logbooks.jlab.org/entry/3983246) and DAQ crashes which were addressed during the owl shift by Alex. Other than that, the plan is to perform GEM R&D runs (with GRINCH OFF) from 6:00 - 7:00 PM and continue with production running until beam is taken away from us at 7:00 AM tomorrow morning!


Upcoming Shifts Which Need To Be Filled

Accelerator and Hall Status

  • Beam will be turned off at 7:00 AM on Tuesday.

Run Plan

To do

  • GEM R&D runs - Monday Swing 6:00 - 7:00 PM (Nilanga, Anu, Kondo & notify the rest of the GEM group on slack)

Resolved Issues

Unresolved Issues

Subsystem Updates

  • Beamline
  • DAQ general
  • HCal
  • BBCal
  • Timing Hodoscope
  • GRINCH
  • GEMS
  • Replay analysis