RC meeting and Run Plan, Monday January 10th
<<SBS Main<<Run Coordinators <<Daily Meetings
Contents
RC Meeting Information
Run Coordinator: Bogdan Wojtsekhowski
Time: 3:15 pm
Remote connection link: https://jlab-org.zoomgov.com/s/1619032184
Or join meeting with the following methods Phone one-tap Phone one-tap: US: +16692545252,,1619032184# or +16468287666,,1619032184# Join by Telephone For higher quality, dial a number based on your current location. Dial: US : +1 669 254 5252 or +1 646 828 7666 or +1 551 285 1373 or +1 669 216 1590 or 833 568 8864 (Toll Free) Meeting ID: 161 903 2184 International numbers Join from an H.323/SIP room system H.323: 161.199.138.10 (US West) 161.199.136.10 (US East) Meeting ID: 161 903 2184 Passcode: 260715 SIP: 1619032184@sip.zoomgov.com Passcode: 260715
Upcoming Shifts Which Need Filled
VERY URGENT: Shifts in January/February need help - 40 openings to fill
Today's estimate: Optic beam Tue. Jan 11, "Bonus beam" Jan 12-16. Official beam Jan 17
Accelerator and Hall Status
- Preparation for beam start
- Beam tune to Hall A on Tuesday owl, may be even Monday swing
To be Done During Remaining Down Time
- The Hall will remain open until 3pm on Monday,
- at which time we will be locking up in preparation for the run.
- Cosmic test of all four layers GEM in BB package
- Test spectrometers power
- Study of GRINCH
- Prepare the LD2/LH2 targets
- Tuesday beam Hall A for physics
- Calibrations of BB optics for SBS-14
- Production according to the SBS-14 plan
- Installation of the UV GEM #4
- Spectrometer move to SBS-14
- Shifts for the week January 10-14
- NEW: HCAL ROC17 ERROR for last 12+ hours
- Occasional timing shifts of ~70 ns
- GEM efficiency analysis.
- DAQ general
- Alex update. Statistics of DAQ reboots.
- HCal
- F1 errors (HCal ROC17 sync errors)... Don't ignore!! End, Reset, Configure, Download. If that doesn't work, call DAQ on call.
- Could 50k replay show a problem FLAG?
- News on time resolution and amplitude analysis.
- BBCal
- Lesson from BBcal HV loss for few hours on Friday. Update on monitoring/reboot methods.
- Timing Hodoscope
- Update on TH setup and time resolution. Plan for spare parts.
- GRINCH
- Update from data analysis.
- GEMS
- DAQ update
- HV and efficiency status. Perspectives for higher luminosity.
- Beamline
- Update on raster analysis.
- Replay analysis
- Massive data replay: script preparation is in progress.
- Observations on data quality.