RC meeting and Run Plan, Monday January 17th
<<SBS Main<<Run Coordinators <<Daily Meetings
Contents
RC Meeting Information
Run Coordinator: Bill Henry
Time: 3:15 pm
Remote connection link: https://jlab-org.zoomgov.com/s/1619032184
Or join meeting with the following methods Phone one-tap Phone one-tap: US: +16692545252,,1619032184# or +16468287666,,1619032184# Join by Telephone For higher quality, dial a number based on your current location. Dial: US : +1 669 254 5252 or +1 646 828 7666 or +1 551 285 1373 or +1 669 216 1590 or 833 568 8864 (Toll Free) Meeting ID: 161 903 2184 International numbers Join from an H.323/SIP room system H.323: 161.199.138.10 (US West) 161.199.136.10 (US East) Meeting ID: 161 903 2184 Passcode: 260715 SIP: 1619032184@sip.zoomgov.com Passcode: 260715
Upcoming Shifts Which Need Filled
URGENT: Shifts in January/February need help - 8 openings to fill
Next opening: This Wednesday, Thursday OWL
Accelerator and Hall Status
- Beam Checkout Completed carbon hole harp scans
- GEM linearity studies completed. Two layers had HV change. linearity uvlayer_1 xygem_1
- Determined currents and began production
Run Plan
- Total Events So Far
- LH2 14.6 M
- LD2 52.9 M
- Dummy 16.5M
Resolved Issues
- Target FSD repaired (8:30pm Saturday)
- MSS copy/delete here
- MPD fiber 16 fixed
- gas shed alarm fixed
- 50k not posting to logbook fixed
Unresolved Issues
- 8 shifts to fill
- SBS Magnet Spikes here
Discussion
- Can we prove we have good Hcal uniformity. Or we may need SBS OFF data.
- Can we go higher in current, Now 8 uA on LD2, 12 uA on LH2? Yes!! 10uA on LD2 15uA on LH2.
- Ratio of LH2 to LD2 data 20%. How long should we cycle?
and