RC meeting and Run Plan, Monday May 6th
Contents
RC Meeting Information
Current RC: Eric Fuchey
RC Daily Meetings are at 3:30 (pm) via Zoom and in person in the counting house meeting room (2nd floor)
- Zoom connection link: https://jlab-org.zoomgov.com/j/1616220064
- Meeting ID: 161 622 0064
Useful Links
Summary
Run update: We had a pretty smooth day yesterday. No major down time, except for a few DAQ issues: https://logbooks.jlab.org/entry/4297134
GEM experts adjusted GEM HVs to increase efficiency on SBS Rear and Side top foil: https://logbooks.jlab.org/entry/4296930 https://logbooks.jlab.org/entry/4296933
We had a small issue of communication with BBCal HV rpi18: https://logbooks.jlab.org/entry/4296999 https://logbooks.jlab.org/entry/4297000 RPI has been remotely rebooted successfully, but reloading the HV as prescribed by the expert, we noticed the rates were slightly lower than previously observed: https://logbooks.jlab.org/entry/4297166
Planned Access to the Hall
Access originally scheduled today was postponed to Thursday.
Accelerator
- In light of the change in accelerator schedule with a Hall C pass change on Thursday, the controlled access initially scheduled today has been pushed to Thursday.
- To Be Confirmed Accelerator beam studies are currently scheduled on May 19th starting at 7am
Current Run Plan
Our plan is to keep on taking LD2 data at 10uA, with 3hrs of LH2 every day (all grouped during day shift). See also Experiment run plans.