RC meeting and Run Plan, Saturday, May 10th

From SBS wiki
Jump to: navigation, search

Back to the calendar

RC Meeting Information

Current RC: Asar Ahmed

RC Daily Meetings on Mondays and Wednesday are at 1:00PM, and Tuesdays, Thursdays, and Fridays at 1:30PM, via Zoom and in person in the counting house meeting room (2nd floor).

Zoom info

Useful Links

Accelerator

  • Many issues reported in today's meeting: Machine instability, current instability, oscillation in orbit motion (1.5m frequency), water leakage in tunnel
  • Could deliver physics beam for 3h on Carbon, and 1:20h for LH2
  • ARC A box supply trip
  • Expeting to send beam by 1:00PM, if fail on DC power for magnets, can down accelerator until Monday

Hall-A

Status of Hall

  • Beam check completed
  • Straight through data on thin Carbon for 3h.
  • 1:20h data on LH2
  • Beam position on the target is fluctuating


Updates on Subsystems

  • ECal:
    Calibration requred
  • HCal:
    Calibration requred
  • GEMS:
    FT L1
  • CDET:
    Calibration requred
  • DAQ:
  • Analysis Software


Access request Today

  • None

Items to keep an eye

  • Target chamber pressure (Lawrence is looking an spare turbo pump, we might get one from Hall-B): Old
  • SBS magnet current stability/overheating test: Plane dropped

Shifts

  • TO and SL required (Shift are filled for June 10)


Run plan when MCC sends beam back

 * 5uA beam for 8 hours
 * 10uA beam for 8 hours
  • For higher current upto 50 uA, MCC needs to notified a few day early


Beam Restoration Procedure

Beam requirements

  • start off at 5 pass beam
  • intrinsic beam size (at target): 150–500 µm (how high can be acceptable??)
  • raster size: 2 mm X 2 mm
  • During kin#3 SBS magnet will be at 1762.23 Amp (copy provided to MCC to keep in the binder)+ corrector magnet setting will be scaled down for this current
  • production run @ 5-10 µA for now
  • For later
    • production beam current : 50 µA