RC meeting and Run Plan, Sunday, May 11th
From SBS wiki
Contents
RC Meeting Information
Current RC: Asar Ahmed
RC Daily Meetings on Mondays and Wednesday are at 1:00PM, and Tuesdays, Thursdays, and Fridays at 1:30PM, via Zoom and in person in the counting house meeting room (2nd floor).
Useful Links
Accelerator
- Still struggling to transport the beam to the halls (https://ace.jlab.org/dtm/open-events?event_id=20337 ).
- No estimated recovery time.
Hall-A
Status of Hall
- Required to follow the beam recovery procedure when we have a beam.
Updates on Subsystems
- ECal:Calibration requred
- HCal:Calibration requred
- GEMS:FT L1: New Pedestals uploaded to vtps
- CDET:Calibration requred
- DAQ:
- Analysis Software
Access request Today
- None
Items to keep an eye
- Target chamber pressure (Lawrence is looking at a spare turbo pump, we might get one from Hall-B): Old
- SBS magnet current stability/overheating test: Plane dropped
Shifts
- TO and SL required (Shifts are filled for June 10)
Run plan when MCC sends beam back
- Follow beam restoration procedure to the Hall
- 2uA beam for ECal and HCal trigger and gain calibration
- Production: Needs a new update
* 5uA beam for 8 hours * 10uA beam for 8 hours
- For higher current up to 50 uA, MCC needs to be notified a few days early
Beam Restoration Procedure
- Use new "cross target" (1x1 mm "+" shape) for beam restoration as described in https://sbs.jlab.org/wiki/index.php/HOW_TOs#Beam_Recovery_Procedure_for_GEp
Beam requirements
- start off at 5 pass beam
- intrinsic beam size (at target): 150–500 µm (how high can be acceptable??)
- raster size: 2 mm X 2 mm
- During kin#3 SBS magnet will be at 1762.23 Amp, the corrector magnets at -80A for all.
- production run @ 5-10 µA for now
- For later
- production beam current : 50 µA