RC meeting and Run Plan, Sunday May 5th

From SBS wiki
Jump to: navigation, search

Back to the calendar

RC Meeting Information

Current RC: Eric Fuchey

RC Daily Meetings are at 3:30 (pm) via Zoom and in person in the counting house meeting room (2nd floor)

Useful Links

Summary

Planned Access to the Hall

No planned access. Opportunistic access shall be given for "long" shutdowns to:

  • Simona and Jimmy (ECAL) => for any 1/2h + access between 8:00 and 5:00.
  • to be completed;

Accelerator

Current Run Plan

Take data at 10 uA for production on LD2: BBCal threshold at -350 mV and HCal threshold at -10 mV for now. Once per shift, take a 1-hour run at 15 uA on LH2 with the production settings. See also Experiment run plans.

Current Issues

Future plans