RC meeting and Run Plan, Thursday January 27th
<<SBS Main<<Run Coordinators <<Daily Meetings
Contents
RC Meeting Information
Run Coordinator: Kondo Gnanvo
Time: 3:15 pm
Remote connection link: https://jlab-org.zoomgov.com/s/1619032184
Or join meeting with the following methods Phone one-tap Phone one-tap: US: +16692545252,,1619032184# or +16468287666,,1619032184# Join by Telephone For higher quality, dial a number based on your current location. Dial: US : +1 669 254 5252 or +1 646 828 7666 or +1 551 285 1373 or +1 669 216 1590 or 833 568 8864 (Toll Free) Meeting ID: 161 903 2184 International numbers Join from an H.323/SIP room system H.323: 161.199.138.10 (US West) 161.199.136.10 (US East) Meeting ID: 161 903 2184 Passcode: 260715 SIP: 1619032184@sip.zoomgov.com Passcode: 260715
Upcoming Shifts Which Need Filled
URGENT: Shifts February need help - only 1 opening remaining
Accelerator and Hall Status
- Beam Permit - SBS - 8
- Energy Lock is OFF (MCC is aware, and looking into it) https://logbooks.jlab.org/entry/3977855
Run Plan
- We are following the run plan for SBS https://logbooks.jlab.org/entry/3977337
- No beam for day swing yesterday Wed 26th
- Beam was back late during owl shift (~ 5:00 am)
- harp and raster scan performed => results posted in HALOG
- Production with LH2 started at about 8 am this morning
- Decrease BBCAL threshold => 1.7khz to 2.6kHz https://logbooks.jlab.org/entry/3977731
Resolved Issues
- issue with empty hodoscope https://logbooks.jlab.org/entry/3977768
- HV primary channels were not turned on => first 3 runs (13529, 13530, 13536) are not good
- Later fixed by Ralph => https://logbooks.jlab.org/entry/3977827
Unresolved Issues
- one GEM APV disabled => https://logbooks.jlab.org/entry/3977698
- SL could not start the DAQ
- Reboot the MPD crate did not fix the issue => Go in controlled access in to replace the card when there is an opportunity