RC meeting and Run Plan, Thursday May 16th
From SBS wiki
Contents
RC Meeting Information
Current RC: Jiwan Poudel
RC Daily Meetings are at 3:30 (pm) via Zoom and in person in the counting house meeting room (2nd floor)
- Zoom connection link: https://jlab-org.zoomgov.com/j/1616220064
Useful Links
Summary
- Beam off for pass change in Hall C around 9:20 yesterday then Hall is accessed to fix GEM DAQ and BBCAL-HV
- First harp scan during day shift wasn't good https://logbooks.jlab.org/entry/4305263, and MCC took beam away to fix optics
- Tune back back to hall in swing shift only. Beam profile and carbon hole scan https://logbooks.jlab.org/entry/4305386 was good, so ready for production around 17:50
- HCAL threshold scan with 2uA current on LD2 w/radiator was completed for -15 to -35 mV https://logbooks.jlab.org/entry/4305569
- Following Andrew suggestion, HCal threshold was fixed to -25 mV and BBCal threshold changed to -290 -> -315 -> -325 mV (*3.8 in MeV)
- Production run overnight with HCAL threshold -25 mV and BBCAL -325 mV @3 uA beam current, setting up DAQ live time > 80%
- SBS magnet readback current fluctuation (set to 1470 A but reaches upto 1500 A sometimes) https://logbooks.jlab.org/entry/4305766 (noticed from MCC around 3:20 am, but RC didn't get info until this morning) -> Talked with Joe Beaufait and Dave Gaskelle (Ellen mentioned this issue was seen by them at this set current), and discussed with Bogdan. [decided to measure the readback current and field locally after the experiment]
- Many SBS GEMs were found off by Holly around 6 am (they seems to be tripped off around 3:40 am and shift crew didn't notice !!!)
- Paul changed the current threshold for parity DAQ
- Bogdan and Andrew changed BBCal threshold back to -300 mV and beam current reduced to 2.5 uA (DAQ livetime ~85%)
- Continue production run whenever we have beam to the hall
Access to the Hall
Accelerator
- Accelerator beam studies currently scheduled on May 19th (starting at 7:00 am) and May 20th (until 7:00 am)
Current Run Plan
- Raster is on.
- Target is LD2 with radiator
- BB magnet at 750 A and SBS magnet at 1470 A (70%)
- Set ps3=0 (coin trigger), ps5=5 , all others to -1 .
- Set BBCal threshold to approximately ~1140 MeV ( -300 mV in BBCALHI DAC) and HCAL threshold (-25 mV)
- Beam current 2.5 uA
- 2 hr long runs
Current Issues
- Frequent DAQ crashing (mostly during the start of run )
- SBS magnet readback current fluctuation (set to 1470 A but reaches upto 1500 A sometimes) https://logbooks.jlab.org/entry/4305766, https://logbooks.jlab.org/entry/4305709
- Open shift schedule (Saturday Day, Sunday Day and Swing shifts) https://misportal.jlab.org/mis/physics/shiftSchedule/?experimentRunId=GEn-RP_KLL
Future plans
- Moller measurement--when??
- Hall Access to remove Analyzer on Sunday (Radcon will survey the hall starting 7:00 am)
- GEMs HV/Luminosity scan on Sunday https://docs.google.com/document/d/1rIy6yNIc4nWDFDWbIboZqdVADxWlbNlhXIRjIiuWVaU/edit
- Parity DAQ run during beam studies