RC meeting and Run Plan, Tuesday February 1st
<<SBS Main<<Run Coordinators <<Daily Meetings
Contents
RC Meeting Information
Run Coordinator: Kondo Gnanvo
Time: 3:15 pm
Remote connection link: https://jlab-org.zoomgov.com/s/1619032184
Or join meeting with the following methods Phone one-tap Phone one-tap: US: +16692545252,,1619032184# or +16468287666,,1619032184# Join by Telephone For higher quality, dial a number based on your current location. Dial: US : +1 669 254 5252 or +1 646 828 7666 or +1 551 285 1373 or +1 669 216 1590 or 833 568 8864 (Toll Free) Meeting ID: 161 903 2184 International numbers Join from an H.323/SIP room system H.323: 161.199.138.10 (US West) 161.199.136.10 (US East) Meeting ID: 161 903 2184 Passcode: 260715 SIP: 1619032184@sip.zoomgov.com Passcode: 260715
Upcoming Shifts Which Need Filled
Accelerator and Hall Status
- Jessie job is completed by 2pm
- I just called MCC for Hall sweep @ 2pm
- Just called back MCC, now they are coming for the sweep
- MCC is still waiting to hear from the collaboration about SBS magnet question
Run Plan
- SBS-9: https://sbs.jlab.org/wiki/index.php/File:SBS-9_update.pdf
- https://logbooks.jlab.org/entry/3980423
- We will start with the plan probably by swing shift today
To do
Resolved Issues
- one GEM APV disabled => https://logbooks.jlab.org/entry/3980091
- Reported issues with unser temperature reading https://logbooks.jlab.org/entry/3978797
- David Flay is notified and had entry https://logbooks.jlab.org/entry/3978797 explaining that it is a not a problem
Unresolved Issues
- Reported issues with SBS magnet current spikes https://logbooks.jlab.org/entry/3978802
- MCC reported that these cause a couple of trips => but things seems ok
- Jack Segal is notified
Subsystem Updates
remotely power cycle the crate now => log entry available