RC meeting and Run Plan, Tuesday May 14th
From SBS wiki
Contents
RC Meeting Information
Current RC: Holly Szumila
RC Daily Meetings are at 3:30 (pm) via Zoom and in person in the counting house meeting room (2nd floor)
- Zoom connection link: https://jlab-org.zoomgov.com/j/1616220064
- Meeting ID: 161 622 0064
Useful Links
Summary
Planned Access to the Hall
Accelerator
Plan unchanged from yesterday:
- no Wien angle change Tuesday for Hall A pass change;
- Accelerator beam studies currently scheduled on May 19th starting at 7am
- Pass change for Hall C Wednesday day shift
Current Run Plan
- Raster is on.
- Target is LD2 with a radiator
- Set BB magnet on (750 A).
- Ask MCC to turn SBS magnet on at 2100 A (100 %).
- Load BBCal HV settings for BB on, SBS-100 %.
- Set ps3 to 0, all others to -1 (coin trigger).
- Set BBCal threshold to approximately ?? GeV ( ?? mV) for (scan) BBCALHI and (leave as-is) BBCALLO, nominal HCAL threshold.
- Starting at 1 μA, observe rates on HCal and BBCal.
- GEM expert present: turn on GEMs at reduced HV (3600V). Begin to check rates and compare to GEn-RP running. Increase beam current and HV as able.
- Maximum 5uA on deuterium+radiator pending daq rates.
- Take data at established beam current for remainder of the experiment.
- Moller measurement--when??