RC meeting and Run Plan, Wednesday April 12th
From SBS wiki
Contents
RC Meeting Information
RC: Simona Malace
Useful Links
Current Status
On the accelerator side:
--> Relevant to us: they worked on setting us up for 2-pass beam to the dumplette. Some HCO left to do once we put the hall in beam permit (Hall A line dipole string, harps, things that only Jay would know about)
On the Hall side:
--> We were on track for lock up by noon but the target had other plans: https://logbooks.jlab.org/entry/4278759
Current Run Plan
- Enjoy the weekend while studying David's crafty run plan.
Notices in Effect for Shift Crew
- For controlled access call the RC and together you will fill out the Hall access checklist. [1]
Current Issues
- Lost my voice but I'm sure there's an upside to that :-) Right, Bogdan?
- Target issues but could be worse
Planned Accesses to the Hall
--> Hall in restricted for Dave M.'s enjoyment
Special Requests
- Beam to A while I'm RC so I don't flip my reputation ... actually I don't have one.
Sub-systems
- SBS and BB magnets: https://logbooks.jlab.org/entry/4278179
- BB GEMs
- BB Grinch
- BB Cal: https://logbooks.jlab.org/entry/4278149
- BB scin
- SBS GEMs: https://logbooks.jlab.org/entry/4277692
- SBS analyzer + RP hodo:
- SBS HCAL
- DAQ:
- Analysis
- Target: it's a pickly
- Beam line: remember when we thought that was a problem?
- Moller: Ellen is doing stuff...