Current Status
On the accelerator side:
--> Beam was delivered into the hall overnight.
--> Raster size was far too large (like 10x10 mm) for the requested 3x3 mm. This caused significant confusion overnight.
On the Hall side:
--> Started beam check out late swing/owl but were confused by raster.
--> Raster size could not be verified so Moller measurement was started.
--> Concluded that raster was very large and using the carbon hole empirically set the size of the raster.
--> Beam check out was completed and detector check out is ongoing.
Current Run Plan
Notices in Effect for Shift Crew
- For controlled access call the RC and together you will fill out the Hall access checklist. [1]
Current Issues
- Some GEM crate issues
Planned Accesses to the Hall
- Steel analyzer insertion in the morning. Shielding bricks? HCal timing change?
Special Requests
Sub-systems
- SBS and BB magnets
- BB GEMs
- BB Grinch
- BB Cal:https://logbooks.jlab.org/entry/4281787
- BB scin: Some issues with channels randomly going to zero
- SBS GEMs
- SBS analyzer + RP hodo
- SBS HCAL
- DAQ: https
- Analysis
- Target: Adjusted the heater power for beam on LH2
- Beam line
- Moller:https://logbooks.jlab.org/entry/4282071
- Raster