RC: Jimmy Caylor

Useful Links

Current Status

On the accelerator side:

  • Very nice over the weekend, rather poor delivery today

--> Hall C noninvasive BCM, not completely noninvasive

  • Hall C going to 4-pass tomorrow, down ~4 hours starting at 9 am


On the Hall side:

  • Detectors and DAQ seem to be working well (SBS GEMs in progress)
  • Still working on getting reasonable efficiency with the SBS GEMs

--> HV tuning has helped some, more to do later today

--> Lower thresholds in software also helped some

  • Sieve inserted this morning

--> Took reasonable stats on magnets off, straight through data

  • Sieve comes out during this meeting

Current Run Plan

  • Got what we could get with the sieve in today
  • SBS GEM HV adjustments during swing
  • Production running until they make us stop

GEN-RP KLL run plans

Notices in Effect for Shift Crew

  • For controlled access call the RC and together you will fill out the Hall access checklist. [1]
  • Please pay attention to BTM, incorrect accounting is happening. also make sure to submit all hours, including the last one.
  • Please fill out the shift checklist and notify RC if there are any issues

Current Issues

  • SBS GEM efficiency
  • Anything else? Seems to be ok

Planned Accesses to the Hall

  • Shielding Bricks - opportunistic
  • SBS GEMs checks - opporunistic
  • Controlled Access tomorrow morning?

Special Requests

Sub-systems

  • SBS and BB magnets
  • BB GEMs
  • BB Grinch
  • BB Cal - Production threshold changed to 1.4 Gev
  • BB scin
  • SBS GEMs - See log book
  • SBS analyzer + RP hodo
  • SBS HCAL
  • DAQ
  • Analysis
  • Target - Sometimes does not want to move right to LH2, need to stop at carbon hole and then go