RC meeting and Run Plan, Wednesday January 12th

From SBS wiki
Jump to: navigation, search

<<SBS Main<<Run Coordinators <<Daily Meetings

RC Meeting Information

Run Coordinator: Bogdan Wojtsekhowski

Time: 3:15 pm

Remote connection link: https://jlab-org.zoomgov.com/s/1619032184

Or join meeting with the following methods Phone one-tap Phone one-tap: US: +16692545252,,1619032184# or +16468287666,,1619032184# Join by Telephone For higher quality, dial a number based on your current location. Dial: US : +1 669 254 5252 or +1 646 828 7666 or +1 551 285 1373 or +1 669 216 1590 or 833 568 8864 (Toll Free) Meeting ID: 161 903 2184 International numbers Join from an H.323/SIP room system H.323: 161.199.138.10 (US West) 161.199.136.10 (US East) Meeting ID: 161 903 2184 Passcode: 260715 SIP: 1619032184@sip.zoomgov.com Passcode: 260715

Upcoming Shifts Which Need Filled

URGENT: Shifts in January/February need help - 20 openings to fill

Next opening: This Sunday OWL

Accelerator and Hall Status

  • Three hall operation accomplished

To be Done During Remaining Down Time

Run Plan

  • Complete GEM DAQ adjustments
  • From data analysis results decide on beam current value
  • Production according to the SBS-14 plan

Resolved Issues

  • Detectors are ready, calibrated
  • BigBite optics data are taken

Unresolved Issues

  • GEM operation
  • Online analysis scripts
  • 20+ shifts to fill

Subsystem Updates

  • Beamline: Any news?
  • DAQ general
    1. Alex update. List of DAQ people on call.
  • HCal
    1. News on time resolution and amplitude analysis.
  • BBCal
    1. Calibration from BB momentum on H(e,e')
    2. Threshold set correctly 400 mV vs 500 mV ??
  • Timing Hodoscope
    1. Update on TH setup and time resolution. Plan for spare parts.
  • GRINCH
    1. Update from data analysis.
  • GEMS
    1. DAQ update
    2. HV and efficiency status. Perspectives for higher luminosity.
  • Replay analysis
    1. Massive data replay: script preparation is in progress.
    2. Observations on data quality.

    </ol>