RC meeting and Run Plan, Wednesday January 19th
<<SBS Main<<Run Coordinators <<Daily Meetings
Contents
RC Meeting Information
Run Coordinator: Caryn Palatchi
Time: 3:15 pm
Remote connection link: https://jlab-org.zoomgov.com/s/1619032184
Or join meeting with the following methods Phone one-tap Phone one-tap: US: +16692545252,,1619032184# or +16468287666,,1619032184# Join by Telephone For higher quality, dial a number based on your current location. Dial: US : +1 669 254 5252 or +1 646 828 7666 or +1 551 285 1373 or +1 669 216 1590 or 833 568 8864 (Toll Free) Meeting ID: 161 903 2184 International numbers Join from an H.323/SIP room system H.323: 161.199.138.10 (US West) 161.199.136.10 (US East) Meeting ID: 161 903 2184 Passcode: 260715 SIP: 1619032184@sip.zoomgov.com Passcode: 260715
Upcoming Shifts Which Need Filled
URGENT: Shifts in January/February need help - only 4 openings remaining
Next opening: This Saturday Sunday OWL
Thursday DAY - Friday DAY : SL's on standby (likely cancel SL shifts, keep TO shifts as target is cold)
Accelerator and Hall Status
- Beam Permit SBS - 14
- Tomorrow: Restricted access - configuration change to SBS - 8 , sieve slit in request
Run Plan
- Continue SBS -14 data taking until 7am Thursday.
- 5 LD2 10 uA 100M (~5 hours) In Progress (51M events @ 9:30 am)
- 6 LH2 15 uA 20M (~2.5 hours) Wednesday DAY
- 6 LD2 10 uA 100M (~5 hours) Wednesday SWING
- 6 Dummy 20 uA 10 M (~1.75 hour) Wednesday SWING
- 7 LH2 15 uA 20M (~2.5 hours) Thursday OWL
- 7 LD2 10 uA 100M (~5 hours) Thursday OWL Beam off before 7am. Rampdown SBS, BB, turn off HVs.
- Thursday
- Beam off 7am Thursday 1/20
- Ramp down SBS, BB, power off HV's (the procedure for transition to controlled access on the wiki doesn't mention any HV..?)
- Sweep 8am-8:30am
- Restricted access
- Change configuration to SBS - 8
- ...Friday....
- close hall - beam permit
- Cosmics with SBS on (70%)...
- new HV setttings for new calorimeter...
- Beam checkout Fri SWING: Harps, carbon hole, SBS ramping procedure, IC calibration
- Sieve slit in optics data - SBS off 1foil GEM alignment. SBS on multi foil (5) optics.
- Sat OWL
- possible issue with escorted access to remove Sieve slit (radcon support?). Push to SAT DAY?
- Sieve slit out - ARM/escorted access of expert to remove slit...(2-3 ppl (1 shifter?) including 1 expert needed to remove slit)
- Sieve slit out data...
- OPS downs?
- Accelerator needs to understand what performance that they can get from SL18 cavity to plan for the next run periods beam energy.They are proposing a 3-4 shift beam down
- (option A)Jan 25th day and restoring beam end of day Jan 26th
- (option B)During kinematics change on Monday Jan 31 and Tues. During down time 1/31-2/1
- (option C)From 1/20 day when we will move BB/SBS
- B goes to 2 pass Monday DAY 1/25
Resolved Issues
Unresolved Issues
- SBS Magnet Spikes. Requires access hereJack's Entry
- Ben Raydo needs opportunistic access for VETROC/GRINCH
Subsystem Updates
- replay issues corrected
- 50k replay done
- single event display working. Will go into hall - missing channels in vtrack. hits seen in vtrack corresp to det geometry. cleanup randoms and got plot picking out 6 tubes firing on average
- Bob Michaels supplied getcharge script to beam beam charge from scalars, gives same result as normalizing to # of triggers