Difference between revisions of "Shift Checklist HowTos"

From SBS wiki
Jump to: navigation, search
Line 7: Line 7:
 
#Shift Leader: your name should go here. If not, rebuke the shift leader for obvious neglect of duty and inquire as to why the SL is not performing the shift checklist per protocol.
 
#Shift Leader: your name should go here. If not, rebuke the shift leader for obvious neglect of duty and inquire as to why the SL is not performing the shift checklist per protocol.
 
#Target operator: the name of the target operator goes here. Check the TO's ID badge to ensure that the name and picture are a match and that we don't have outside spies trying to steal our data. If the credentials do not match or if the ID badge resembles that in the figure below, notify the RC, the crew chief and all the collaboration.[[File:UserJB.png|250px|center|Figure-1. JLab user ID.]]
 
#Target operator: the name of the target operator goes here. Check the TO's ID badge to ensure that the name and picture are a match and that we don't have outside spies trying to steal our data. If the credentials do not match or if the ID badge resembles that in the figure below, notify the RC, the crew chief and all the collaboration.[[File:UserJB.png|250px|center|Figure-1. JLab user ID.]]
#Beam energy, current, positions (BPM1H04A/E X/Y) can be seen in Figure 2. This information is also available on the "Beam" section of the [[JmenuGUIs#Hall_A_General_Tools_GUI|Hall A General Tools GUI]]. Extra credit will be given if the beam energy is converted to calories, the beam current to the number of elementary charges per second and the positions to units of Planck length.[[File:HallAStatusScreenHowTo.png|600px|Figure-2. Hall A status screen.|center]]
+
#Beam energy, current, positions (BPM1H04A/E X/Y) can be seen in Figure 2. This information is also available on the "BEAMLINE" section of the [[JmenuGUIs#Hall_A_General_Tools_GUI|Hall A General Tools GUI]]. Extra credit will be given if the beam energy is converted to calories, the beam current to the number of elementary charges per second and the positions to units of Planck length.[[File:HallAStatusScreenHowTo.png|600px|Figure-2. Hall A status screen.|center]]
 
#Energy lock: to find the energy lock screen type "energy lock" into the jmenu search bar and select "Energy Locks". The screen should look as pictured on the left below with the 1A and 2A green lights on if the ARC l and 2 energy locks are engaged. If you have trouble finding the energy lock, then other hair products will work as well.[[File:energy_lock.png|250px|center]]
 
#Energy lock: to find the energy lock screen type "energy lock" into the jmenu search bar and select "Energy Locks". The screen should look as pictured on the left below with the 1A and 2A green lights on if the ARC l and 2 energy locks are engaged. If you have trouble finding the energy lock, then other hair products will work as well.[[File:energy_lock.png|250px|center]]
 
#[[File:Tor.png|right|thumb|70px]]Hall A vacuum: from jmenu type into the search bar "vacuum halla" and select "Hall A vacuum combo". The GUI below should come up. Check that vacuum along the beam line is at the level of 10^-6 Torr or less. If you think the "o" Torr is actually an onion, then you're probably a geek. Stop taking physics shifts and try to get a job in computing. [[File:HallAvacuumGUI.png|600px|center|Figure-3. Hall A vacuum GUI.]].
 
#[[File:Tor.png|right|thumb|70px]]Hall A vacuum: from jmenu type into the search bar "vacuum halla" and select "Hall A vacuum combo". The GUI below should come up. Check that vacuum along the beam line is at the level of 10^-6 Torr or less. If you think the "o" Torr is actually an onion, then you're probably a geek. Stop taking physics shifts and try to get a job in computing. [[File:HallAvacuumGUI.png|600px|center|Figure-3. Hall A vacuum GUI.]].

Revision as of 12:51, 21 October 2021

<<SBS Main<<Shift Takers (Shift Leader)

Checklist

This checklist guide is intended to be a help in filling out the checklist, but don't take its instructions too literally.

  1. Your name: check your JLab ID to make sure you have spelled your name correctly. By the end of and Owl shift even this can be difficult.
  2. Shift: I hope the answer to this is obvious. If not please call the guard shack and request to be escorted off site.
  3. Shift Leader: your name should go here. If not, rebuke the shift leader for obvious neglect of duty and inquire as to why the SL is not performing the shift checklist per protocol.
  4. Target operator: the name of the target operator goes here. Check the TO's ID badge to ensure that the name and picture are a match and that we don't have outside spies trying to steal our data. If the credentials do not match or if the ID badge resembles that in the figure below, notify the RC, the crew chief and all the collaboration.
    Figure-1. JLab user ID.
  5. Beam energy, current, positions (BPM1H04A/E X/Y) can be seen in Figure 2. This information is also available on the "BEAMLINE" section of the Hall A General Tools GUI. Extra credit will be given if the beam energy is converted to calories, the beam current to the number of elementary charges per second and the positions to units of Planck length.
    Figure-2. Hall A status screen.
  6. Energy lock: to find the energy lock screen type "energy lock" into the jmenu search bar and select "Energy Locks". The screen should look as pictured on the left below with the 1A and 2A green lights on if the ARC l and 2 energy locks are engaged. If you have trouble finding the energy lock, then other hair products will work as well.
    Energy lock.png
  7. Tor.png
    Hall A vacuum: from jmenu type into the search bar "vacuum halla" and select "Hall A vacuum combo". The GUI below should come up. Check that vacuum along the beam line is at the level of 10^-6 Torr or less. If you think the "o" Torr is actually an onion, then you're probably a geek. Stop taking physics shifts and try to get a job in computing.
    Figure-3. Hall A vacuum GUI.
    .
  8. Target vacuum: ask the target operator. It is available on the target screen and should be in the 10^-7 Torr or less. If the TO doesn't know where to find it, send them home and call HR to have their paycheck stopped immediately.
  9. Fast raster size at target: due to the quadrupole optics of the Hall A beamline downstream of the raster, the MCC setpoint for the raster seldom reflects the actual size at the target. The actual size is communicated via the whiteboard or by word of mouth but should usually be 2mm x 2mm. If you aren't sure, ask someone who knows (in this situation praying doesn't count as "asking someone who knows").
  10. Fast raster MCC units: this is available on the Hall A status screen (see the yellow outline in Figure 3.) Psst, this is what MCC thinks the size is. Don't give away our secret.
  11. Target alarm handler: ask the TO if the target alarm handler is on, visible and working. If the TO is asleep, gently turn the alarm volume to maximum and press the "test sound" button.
  12. Alarm Handler status: the Hall A general alarm handler should be active on hadesk9. Check to make sure it is there, active and that the volume is up by pressing the "test sound" drop down menu option. No humor here. What is wrong with you? Are you expecting humor on every step of the list?
  13. Target in use (ask TO). Ask the TO is right in the question...so who needs guidance on this one. Good answers from the TO include optics, carbon 2mm hole, carbon 5mm hole, LH2, LD2, LH2+rad, LD2+rad and dummy. If the TO answers "dummy", don't take it as an insult; write it down.
  14. Target temperature/pressure: these are available on the target control GUI. In case you haven't been for a checkup lately, your target temperature and pressure should be 98.6°F and 120/80 mmHg. We want a healthy shift crew!
  15. Hall A survey (TV cameras). TV cameras!? Really? No! Don't expect crew from the local news. You don't need to check your make-up or comb your hair. This is where you use the camera system to look around the hall for anything amiss like puddles, leaks, smoke or plumes.
  16. Hall A VESDA system OK? This panel is located on the wall as you come into the Hall A Counting House front room and should have all lights green and in the lowest alert setting as shown in the figure below. VESDA stands for very early smoke detection alarm, so no trying to sneak a smoke inside the LHRS hut (even if Clint Eastwood is cool with it).
    Clint.jpg
    Figure-4. Hall A VESDA panel.