RC meeting and Run Plan, Wednesday April 18th

From SBS wiki
Revision as of 12:59, 18 April 2024 by Simona (Talk | contribs) (Created page with "[https://sbs.jlab.org/wiki/index.php/Daily_Meetings << Back to Daily Meetings] = RC Meeting Information = RC: Simona Malace/Jimmy Caylor = Useful Links = * [https://cebaf.j...")

(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search

<< Back to Daily Meetings

RC Meeting Information

RC: Simona Malace/Jimmy Caylor

Useful Links

Current Status

On the accelerator side:

--> Ops took the machine offline for retuning since yesterday morning. It has been a very, very long process. As of 11:38 am we still haven't seen beam to the Hall A dump. https://logbooks.jlab.org/entry/4281320

On the Hall side:

--> Dave Meekins condensed H and D overnight. The target was ready shortly before 5 am. We took Hall A to beam permit at 4:49 am.

--> Faraz trained the Moller solenoid up to 60 A: https://logbooks.jlab.org/entry/4281224

Current Run Plan

GEN-RP KLL run plans

Notices in Effect for Shift Crew

  • For controlled access call the RC and together you will fill out the Hall access checklist. [1]

Current Issues

  • Hall A beam too large at the dumplette. Hopefully MCC will address this soon enough.

Planned Accesses to the Hall

  • Sieve slit insertion at some point when ready for Optics data. Shielding bricks?

Special Requests

Sub-systems