RC meeting and Run Plan, Wednesday April 18th
From SBS wiki
Contents
RC Meeting Information
RC: Jimmy Caylor
Useful Links
Current Status
On the accelerator side:
--> Ops took the machine offline for retuning since yesterday morning. It has been a very, very long process. As of 11:38 am we still haven't seen beam to the Hall A dump. https://logbooks.jlab.org/entry/4281320
On the Hall side:
--> Dave Meekins condensed H and D overnight. The target was ready shortly before 5 am. We took Hall A to beam permit at 4:49 am.
--> Faraz trained the Moller solenoid up to 60 A: https://logbooks.jlab.org/entry/4281224
Current Run Plan
Notices in Effect for Shift Crew
- For controlled access call the RC and together you will fill out the Hall access checklist. [1]
Current Issues
- Hall A beam too large at the dumplette. Hopefully MCC will address this soon enough.
Planned Accesses to the Hall
- Sieve slit insertion at some point when ready for Optics data. Shielding bricks?
Special Requests
Sub-systems
- SBS and BB magnets
- BB GEMs
- BB Grinch
- BB Cal:https://logbooks.jlab.org/entry/4281378
- BB scin
- SBS GEMs
- SBS analyzer + RP hodo
- SBS HCAL
- DAQ: https
- Analysis
- Target
- Beam line
- Moller
- Raster