RC meeting and Run Plan, Wednesday April 19th

From SBS wiki
Revision as of 15:08, 19 April 2024 by Jcaylor (Talk | contribs) (Created page with "[https://sbs.jlab.org/wiki/index.php/Daily_Meetings << Back to Daily Meetings] = RC Meeting Information = RC: Jimmy Caylor = Useful Links = * [https://cebaf.jlab.org/files/...")

(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search

<< Back to Daily Meetings

RC Meeting Information

RC: Jimmy Caylor

Useful Links

Current Status

On the accelerator side:

--> Beam delivery is good when we take it


On the Hall side:

--> Hall sweep was completed just before 9 am

--> Techs quickly inserted the steel analyzer

--> Alex checked on DAQ and Jiwan on coin trigger window

--> Currently GEMs are turned off with issue with gas mixture. Need to wait for new mixture to stabilize until turning GEMs on with beam. Multi-hour process

Current Run Plan

  • What to do with no GEMs for at least a few hours

--> BCM calibration?

GEN-RP KLL run plans

Notices in Effect for Shift Crew

  • For controlled access call the RC and together you will fill out the Hall access checklist. [1]
  • Please pay attention to BTM, incorrect accounting is happening
  • Please fill out the shift checklist and notify RC if there are any issues

Current Issues

  • GEM gas mixture needed changing

Planned Accesses to the Hall

  • Shielding Bricks - opportunistic

Special Requests

Sub-systems