RC meeting and Run Plan, Thursday May 2nd
Contents
RC Meeting Information
Current RC: Eric Fuchey
RC Daily Meetings are at 3:30 (pm) via Zoom and in person in the counting house meeting room (2nd floor)
- Zoom connection link: https://jlab-org.zoomgov.com/j/1616220064
- Meeting ID: 161 622 0064
- Passcode: 314159
Useful Links
Summary
We were taking data overnight without major issues. We ran at 10 uA on LD2 and 15 uA on LH2 (one run per shift) with BBCal threshold set to -350 mV and HCal threshold set to -10 mV.
Today is a Maintenance Day. See https://logbooks.jlab.org/entry/4293542 for the planned accelerator work. Beam studies are also possible today. According to the current plan, beam in the machine is expected in early Swing and beam restoration to the Halls in mid Swing.
Hall A is in Restricted access now. We plan to stay in Restricted access towards the end of Day shift. A lot of work is planned in the Hall today.
Day shift summary (https://logbooks.jlab.org/entry/4292778).
Swing shift summary (https://logbooks.jlab.org/entry/4293086).
Owl shift summary (https://logbooks.jlab.org/entry/4293382).
We will have our daily 3:30 pm RC meeting on the 2nd floor of the counting house and on zoom.
Planned Access to the Hall
No planned access. Opportunistic access shall be given for "long" (1/2h+) shutdowns to:
- Simona and Jimmy (ECAL).
- to be completed;
Accelerator
Current Run Plan
Take data at 10 uA for production on LD2: BBCal threshold at -350 mV and HCal threshold at -10 mV for now. Once per shift, take a 1-hour run at 15 uA on LH2 with the production settings. See also Experiment run plans.