RC meeting and Run Plan, Thursday May 16th
From SBS wiki
Contents
RC Meeting Information
Current RC: Jiwan Poudel
RC Daily Meetings are at 3:30 (pm) via Zoom and in person in the counting house meeting room (2nd floor)
- Zoom connection link: https://jlab-org.zoomgov.com/j/1616220064
Useful Links
Summary
- During pass change in accelerator, Hall was in controlled access. Hall was locked to beam permit towards the end of Day shift.
- Harp scan https://logbooks.jlab.org/entry/4304603, raster check https://logbooks.jlab.org/entry/4304608 and carbon hole scan https://logbooks.jlab.org/entry/4304647 was performed during the mid-swing shift.
- BBCal Rate scan done varying threshold with 1uA current (290 MeV to 2000 MeV) : https://logbooks.jlab.org/entry/4304702, https://logbooks.jlab.org/entry/4304775
- After talking with Bogdan and Arun, threshold of 900 MeV (-237 mV) was set for 1uA beam current to take production data (coincidence rate ~3.2kHz)
- Production running until 9:20 am this morning, then beam off for pass change in Hall C
- Hall access by GEM group and BBCAL
Access to the Hall
Accelerator
- Accelerator beam studies currently scheduled on May 19th (starting at 7:00 am) and May 20th (until 7:00 am)
Current Run Plan
- Raster is on.
- Target is LD2 with a radiator
- BB magnet at 750 A and SBS magnet at 1470 A (70%)
- Set ps3 to 0, ps5=5 , all others to -1 (coin trigger).
- Set BBCal threshold to approximately 1 GeV ( -300 mV in BBCALHI DAC) and HCAL threshold (-25 mV)
- Beam current ~2.5 uA
- 2 hr long runs
Current Issues
- SBS magnet readback current fluctuation (set to 1470 A but reaches upto 1500 A sometimes)
Future plans
- Moller measurement--when??
- Hall Access to remove Analyzer on Sunday (Radcon will survey the hall starting 7:00 am)
- GEMs HV/Luminosity scan on Sunday https://docs.google.com/document/d/1rIy6yNIc4nWDFDWbIboZqdVADxWlbNlhXIRjIiuWVaU/edit