Current RC: Jiwan Poudel

RC Daily Meetings are at 3:30 (pm) via Zoom and in person in the counting house meeting room (2nd floor)

Useful Links

Summary

  • Beam off for pass change in Hall C around 9:20 yesterday then Hall is accessed to fix GEM DAQ and BBCAL-HV
  • First harp scan during day shift wasn't good https://logbooks.jlab.org/entry/4305263, and MCC took beam away to fix optics
  • Tune back back to hall in swing shift only. Beam profile and carbon hole run was good, so ready for production around 17:50

Access to the Hall

Accelerator

  • Accelerator beam studies currently scheduled on May 19th (starting at 7:00 am) and May 20th (until 7:00 am)

Current Run Plan

  • Raster is on.
  • Target is LD2 with a radiator
  • BB magnet at 750 A and SBS magnet at 1470 A (70%)
  • Set ps3=0 (coin trigger), ps5=5 , all others to -1 .
  • Set BBCal threshold to approximately ~1140 MeV ( -300 mV in BBCALHI DAC) and HCAL threshold (-25 mV)
  • Beam current ~2.5 uA
  • 2 hr long runs

Current Issues

Future plans