RC meeting and Run Plan, Monday January 10th

From SBS wiki
Jump to: navigation, search

<<SBS Main<<Run Coordinators <<Daily Meetings

RC Meeting Information

Run Coordinator: Bogdan Wojtsekhowski

Time: 3:15 pm

Remote connection link: https://jlab-org.zoomgov.com/s/1619032184

Or join meeting with the following methods Phone one-tap Phone one-tap: US: +16692545252,,1619032184# or +16468287666,,1619032184# Join by Telephone For higher quality, dial a number based on your current location. Dial: US : +1 669 254 5252 or +1 646 828 7666 or +1 551 285 1373 or +1 669 216 1590 or 833 568 8864 (Toll Free) Meeting ID: 161 903 2184 International numbers Join from an H.323/SIP room system H.323: 161.199.138.10 (US West) 161.199.136.10 (US East) Meeting ID: 161 903 2184 Passcode: 260715 SIP: 1619032184@sip.zoomgov.com Passcode: 260715

Upcoming Shifts Which Need Filled

VERY URGENT: Shifts in January/February need help - 40 openings to fill

Today's estimate: Optic beam Tue. Jan 11, "Bonus beam" Jan 12-16. Official beam Jan 17

Accelerator and Hall Status

  • Preparation for beam start
  • Beam tune to Hall A on Tuesday owl, may be even Monday swing

To be Done During Remaining Down Time

  • The Hall will remain open until 3pm on Monday,
    at which time we will be locking up in preparation for the run.
    • Cosmic test of all four layers GEM in BB package
    • Test spectrometers power
    • Study of GRINCH
    • Prepare the LD2/LH2 targets

    Run Plan

    • Tuesday beam Hall A for physics
    • Calibrations of BB optics for SBS-14
    • Production according to the SBS-14 plan

    Resolved Issues

    • Installation of the UV GEM #4
    • Spectrometer move to SBS-14
    • Shifts for the week January 10-14

    Unresolved Issues

    • NEW: HCAL ROC17 ERROR for last 12+ hours
    • Occasional timing shifts of ~70 ns
    • GEM efficiency analysis.

    Subsystem Updates

    1. DAQ general
      1. Alex update. Statistics of DAQ reboots.
    2. HCal
      1. F1 errors (HCal ROC17 sync errors)... Don't ignore!! End, Reset, Configure, Download. If that doesn't work, call DAQ on call.
      2. Could 50k replay show a problem FLAG?
      3. News on time resolution and amplitude analysis.
    3. BBCal
      1. Lesson from BBcal HV loss for few hours on Friday. Update on monitoring/reboot methods.
    4. Timing Hodoscope
      1. Update on TH setup and time resolution. Plan for spare parts.
    5. GRINCH
      1. Update from data analysis.
    6. GEMS
      1. DAQ update
      2. HV and efficiency status. Perspectives for higher luminosity.
    7. Beamline
      1. Update on raster analysis.
    8. Replay analysis
      1. Massive data replay: script preparation is in progress.
      2. Observations on data quality.